Main Page: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 7: Line 7:
*[[Integration Status|Integration Status]]  
*[[Integration Status|Integration Status]]  
*[[SignoutList|Parts/Tools Signout List]]  
*[[SignoutList|Parts/Tools Signout List]]  
*[http://penfieldrobotics.com/wiki/index.php?title=Talk:Mechanical_2.16.2009 <span style="color: #ff0000">Conveyor Redesign Discussion (new 2/19/2009)</span>]&nbsp;- 2/26 Status update added.&nbsp;  
*[http://penfieldrobotics.com/wiki/index.php?title=Talk:Mechanical_2.16.2009 <span style="color: #ff0000">Conveyor Redesign Discussion (new 2/19/2009)</span>]&nbsp;- 3/1 Status update added short link to TomC POC&nbsp;
*[[RIT Regional Preparation|RIT Regional Preparation]]  
*[[RIT Regional Preparation|RIT Regional Preparation]]  
*[[Chesapeake Regional Preparation|Chesapeake Regional Preparation]]  
*[[Chesapeake Regional Preparation|Chesapeake Regional Preparation]]  

Revision as of 13:13, 1 March 2009

General Pages:


FIRST INFO: Competition Manual  Team Updates  Team Q&A

Subteam Engineering Notebooks:

Mechanical 1

Mechanical 2

Electrical Main

Electrical Controls

Programming

Drivetrain

Field/Crate

Awards

At a Minimum EACH Engineering Notebook Entry should include the following:

1. Names of team members helping

2. DATE & Start & Stop Time

3. Task List Accomplished

4. Next Tasks to Do

5. Any Images (Inventor, Scanned Sketches, Photos, Etc) Pertinent to the day's work!
In addition, you can do any details or lessons learned from your tasks done that day. Feel free to attach any photos, details, spreadsheets, CAD screenshots or drawings.


Standard Engineering Notebook Template