Main Page: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 7: Line 7:
*[[Integration Status|Integration Status]]  
*[[Integration Status|Integration Status]]  
*[[SignoutList|Parts/Tools Signout List]]  
*[[SignoutList|Parts/Tools Signout List]]  
*
*<span style="color: #ff0000">Conveyor&nbsp;Retool and RIT Prepe</span>&nbsp;- '''START HERE - 3/2 Update added Pointer so all the new info added by TomC and MikeW.'''
=== [http://penfieldrobotics.com/wiki/index.php?title=Talk:Mechanical_2.16.2009 <span style="color: #ff0000">Conveyor Redesign Discussion (new 2/19/2009)</span>]&nbsp;-'''START HERE - 3/2 Update added Pointer so all the new info added by TomC and MikeW.''' ===


*[[RIT Regional Preparation|RIT Regional Preparation]]  
*[[RIT Regional Preparation|RIT Regional Preparation]]  

Revision as of 08:47, 2 March 2009

General Pages:


FIRST INFO: Competition Manual  Team Updates  Team Q&A

Subteam Engineering Notebooks:

Mechanical 1

Mechanical 2

Electrical Main

Electrical Controls

Programming

Drivetrain

Field/Crate

Awards

At a Minimum EACH Engineering Notebook Entry should include the following:

1. Names of team members helping

2. DATE & Start & Stop Time

3. Task List Accomplished

4. Next Tasks to Do

5. Any Images (Inventor, Scanned Sketches, Photos, Etc) Pertinent to the day's work!
In addition, you can do any details or lessons learned from your tasks done that day. Feel free to attach any photos, details, spreadsheets, CAD screenshots or drawings.


Standard Engineering Notebook Template