2009:Drivetrain 1.14.2009
From 1511Wookiee
Jump to navigationJump to search
1.14.2009
Start time: 6:30
End time: 9:00
Members present: Larry, Josh, ToNy
Tasks Completed:
- Update the wiki for the last two sessions
- Finish mounting the trailer hitch.
- Finalize bumper mounting technique.
Tasks In Progress:
- Build up bumpers.
Tasks to Complete:
- Build up new frame to use while other is out being powder coated
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)