2009:Drivetrain 1.14.2009

From 1511Wookiee
Revision as of 17:51, 14 January 2009 by Drivetrain (talk | contribs)
Jump to navigationJump to search

1.14.2009

Start time: 6:30

End time: 9:00

Members present: Larry, Josh, ToNy


Tasks Completed:

  • Update the wiki for the last two sessions
  • Finish mounting the trailer hitch.
  • Finalize bumper mounting technique.



Tasks In Progress:

  • determin rear length
    • Build up bumpers.



Tasks to Complete:

  • Build up new frame to use while other is out being powder coated



Images & Additional Updates:

Drivetrain 1-14-2009.JPGUntitled.JPG


(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)