2010:Field/Crate: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
== This is the Field/Crate Subteam's Engineering Notebook  ==
== This is the Field/Crate Subteam's Engineering Notebook  ==
----


'''1.06.2009'''  
'''1.06.2009'''  
Line 29: Line 27:
3.) Glue/assemble trailers  
3.) Glue/assemble trailers  


<br>
<br>  


----
----
'''&nbsp;1.07.2009'''
Start time: 6:30
End time: 9:00
Members present: Amy, Theo, Kevin<br>
<br>Tasks completed:
1.) Finished cutting large PVC&nbsp;for center of trailer<br>
2.) Cut half of hexagonal luan plywood bases needed (6/12)<br>
3.) Cut lots of little 2x4 pieces for bumper supports<br>
4.) Sketched out bumper plywood measurements &amp; cut lines
<br>Tasks to complete:
1.) Cut other half of luan plywood bases<br>
2.) Cut out bumper plywood<br>
3.) Glue/assemble trailers


<br>
<br>


'''&nbsp;1.07.2009'''
----


Start time: 6:30
<br>'''1.08.2009'''
 
Start time: 6:20


End time: 9:00
End time: 9:00


Members present: Amy, Theo, Kevin<br>
Members present: Amy, Theo, Curtis<br>


<br>Tasks completed:
<br>Tasks completed:


1.) Finished cutting large PVC&nbsp;for center of trailer<br>
1.) Finished cutting hexagonal luan plywood bases<br>


2.) Cut half of hexagonal luan plywood bases needed (6/12)<br>
2.) Cut metal for trailer tongues<br>


3.) Cut lots of little 2x4 pieces for bumper supports<br>
3.) Made template for holes to be cut in hexagonal bases<br>


4.) Sketched out bumper plywood measurements &amp; cut lines
<br>Tasks to complete:


<br>Tasks to complete:
1.) Drill/cut holes in 11 other trailer bases<br>


1.) Cut other half of luan plywood bases<br>
2.) Cut out bumper plywood


2.) Cut out bumper plywood<br>
3.) Glue/assemble trailers <br>


3.) Glue/assemble trailers
<br>

Revision as of 19:37, 8 January 2009

This is the Field/Crate Subteam's Engineering Notebook

1.06.2009

Start time: 6:45

End time: 8:45

Members present: Amy, Theo, Curtis, Karen


Tasks completed:

1.) Cut small PVC for outside uprights of trailer

2.) Began to cut large PVC for center column

3.) Began sketching out measurements on plywood sheet


Tasks to complete:

1.) Finish cutting large PVC for center column

2.) Sketch and cut plywood for base

3.) Glue/assemble trailers



 1.07.2009

Start time: 6:30

End time: 9:00

Members present: Amy, Theo, Kevin


Tasks completed:

1.) Finished cutting large PVC for center of trailer

2.) Cut half of hexagonal luan plywood bases needed (6/12)

3.) Cut lots of little 2x4 pieces for bumper supports

4.) Sketched out bumper plywood measurements & cut lines


Tasks to complete:

1.) Cut other half of luan plywood bases

2.) Cut out bumper plywood

3.) Glue/assemble trailers




1.08.2009

Start time: 6:20

End time: 9:00

Members present: Amy, Theo, Curtis


Tasks completed:

1.) Finished cutting hexagonal luan plywood bases

2.) Cut metal for trailer tongues

3.) Made template for holes to be cut in hexagonal bases


Tasks to complete:

1.) Drill/cut holes in 11 other trailer bases

2.) Cut out bumper plywood

3.) Glue/assemble trailers