2010:Field/Crate: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
= Master Task List  =
= Master Task List  =


#<strike>Complete 1 bump, 1 platform</strike>, and 1 tower for team testing
#<strike>Complete 1 bump, 1 platform</strike>, and 1 tower for team testing  
#<strike>Purchase rest of materials for ball returns, carpet for bumps, foam for goals, wood for goals</strike>&nbsp;  
#<strike>Purchase rest of materials for ball returns, carpet for bumps, foam for goals, wood for goals</strike>&nbsp;  
#<strike>Complete rest of bumps (12) </strike>1/24  
#<strike>Complete rest of bumps (12) </strike>1/24  
#<strike>Complete Goals&nbsp;and Goal Ramps (4)</strike>&nbsp;2/2
#<strike>Complete Goals&nbsp;and Goal Ramps (4)</strike>&nbsp;2/2  
#Complete ball returns and towers&nbsp; (2)  
#Complete ball returns and towers&nbsp; (2)  
#<strike>Make Tridents (2) </strike>1/23  
#<strike>Make Tridents (2) </strike>1/23  
Line 18: Line 18:
#<strike>Create shopping list for ball returns</strike> Material bought on McMaster 1/28 and at Home Depot 1/30  
#<strike>Create shopping list for ball returns</strike> Material bought on McMaster 1/28 and at Home Depot 1/30  
#<strike>Assemble last goal front ramp</strike> 1/26  
#<strike>Assemble last goal front ramp</strike> 1/26  
#4 angle pieces for front of goals  
#<strike>4 angle pieces for front of goals</strike> 2/2
#<strike>Create tops for 3 goals</strike> 1/31  
#<strike>Create tops for 3 goals</strike> 1/31  
#Do we have enough soccer balls?  
#Do we have enough soccer balls?  
Line 30: Line 30:
#Need lots of strong velcro- hefty Hefty HEFTY  
#Need lots of strong velcro- hefty Hefty HEFTY  
#Carpet (12) bumps  
#Carpet (12) bumps  
#Wrap foam in spandex
#Attache Foam to inside of goals
#Attache Foam to inside of goals



Revision as of 06:02, 3 February 2010

Master Task List

  1. Complete 1 bump, 1 platform, and 1 tower for team testing
  2. Purchase rest of materials for ball returns, carpet for bumps, foam for goals, wood for goals 
  3. Complete rest of bumps (12) 1/24
  4. Complete Goals and Goal Ramps (4) 2/2
  5. Complete ball returns and towers  (2)
  6. Make Tridents (2) 1/23
  7. Create vision targets (4) 
  8. Look to see if crate or alliance station walls need maintenance or improvment
  9. Verify that the crate dimensions are the same as last year.  Determine if we need to alter the crate.
  10. Make sure the crate still has the applicable shelves.

1/26 Additions:

  1. Determine carpet Purchased 1/30/10
  2. Determine coefficient of friction of spandex vs foam by its self  Spandex will be used 1/30/10
  3. Create shopping list for ball returns Material bought on McMaster 1/28 and at Home Depot 1/30
  4. Assemble last goal front ramp 1/26
  5. 4 angle pieces for front of goals 2/2
  6. Create tops for 3 goals 1/31
  7. Do we have enough soccer balls?
  8. Look at full field current model- how to integrate goals- over goal wall with vision targets
  9. Goal netting for sides? Ordered 1/28
  10. Lag bolts for tower 4X4s  Ordered 1/28 - McMaster
  11. Determine final connections of bumps, towers, and platforms to carpet and field sides
  12. Cut notches (2) in 4 bumps for tower 4X4 connections
  13. Re-print 4 vision targets
  14. Our versions of the 3 remaining corrals
  15. Need lots of strong velcro- hefty Hefty HEFTY
  16. Carpet (12) bumps
  17. Wrap foam in spandex
  18. Attache Foam to inside of goals


This is the Field/Crate Subteam's Engineering Notebook

Week 1

2010:FieldCrate 01:10
2010:FieldCrate 01:12
2010:FieldCrate 01:13
2010:FieldCrate 01:14
2010:FieldCrate 01:16
2010:FieldCrate 01:17

Week 2
2010:FieldCrate 01:19
2010:FieldCrate 01:20
2010:FieldCrate 01:21
2010:FieldCrate 01:23
2010:FieldCrate 01:24

Week 3

2010:FieldCrate 01:26
2010:FieldCrate 01:27
2010:FieldCrate 01:28
2010:FieldCrate 01:30
2010:FieldCrate 01:31

Week 4

2010:FieldCrate 02:02
2010:FieldCrate 02:03
2010:FieldCrate 02:04
2010:FieldCrate 02:06
2010:FieldCrate 02:07

Week 5

2010:FieldCrate 02:09
2010:FieldCrate 02:10
2010:FieldCrate 02:11
2010:FieldCrate 02:13
2010:FieldCrate 02:14

Week 6

2010:FieldCrate 02:16
2010:FieldCrate 02:17
2010:FieldCrate 02:18
2010:FieldCrate 02:20
2010:FieldCrate 02:21

Engineering Notebook Templates are available at: Engineering_Notebook_Template
Please Label all pages 2010:FieldCrate XX.XX to avoid Confusion!!

Archives