2010:Integration Status: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 5: Line 5:
[[Media:BOM_2009.xls]]  
[[Media:BOM_2009.xls]]  


[[Media:BOM_ElectricalMain7.xls]]  
[[Media:BOM_ElectricalMain8.xls]]  


[[Media:BOM_Mechanical.xls]]  
[[Media:BOM_Mechanical.xls]]  
Line 11: Line 11:
[[Media:BOM_Drivetrain.xls]]  
[[Media:BOM_Drivetrain.xls]]  


[[Media:BOM_ElectricalControls.xls]]
[[Media:BOM_ElectricalControls.xls]]  


== Integration&nbsp;Status<br>  ==
== Integration&nbsp;Status<br>  ==

Revision as of 18:49, 27 January 2009

Bill of Materials

Subteams, please use the attached template to update the Bill of Materials!!  Please ONLY use your own sheet (see tabs on the bottom), and upload it to the Wiki under the name BOM_(subteam).xls.  For Example Drivetrain would be BOM_Drivetrain.xls.  You can then update that file over and over again, and the wiki will save all of the revisions, so there is NO NEED to put a Date on it.

Media:BOM_2009.xls

Media:BOM_ElectricalMain8.xls

Media:BOM_Mechanical.xls

Media:BOM_Drivetrain.xls

Media:BOM_ElectricalControls.xls

Integration Status

Subteams, please used the attached document to format your integration notes for the meeting. They can be handwritten or typed, it is just a reminder for what info you need to provide.

Media:IntegrationSheet.doc

Also please make sure to update the Robot Design page as you add details to your designs!!

Integration Meetings are Tuesday & Thursday at 5:30PM, and Saturday at 1:00PM in F2 Back Room.

Integration Meeting Notes

Thursday 1/8/2009

Saturday 1/10/2009

Tuesday 1/13/2009

Thursday 1/15/2009

Saturday 1/17/2009

Tuesday 1/20/2009

Thursday 1/22/2009

Sunday 1/25/2009

Tuesday 1/27/2009

Thursday 1/29/2009

Saturday 1/31/2009

Tuesday 2/2/2009

Thursday 2/4/2009

Saturday 2/6/2009

Tuesday 2/9/2009

Thursday 2/11/2009

Parts Needed To Buy

Please use the Shopping List Page!


Parts Needing To Be Made

Please use the Fabrication Page!


Subteam Issue Tracking 

Date Issue Description Needed By (subteam) Assigned To (subteam) Date Needed Complete
1/8 Need dimensions of surfaces where control system/electronics can be mounted Electrical Main Mech1, Mech 2, Drive 1/15 NO
1/13 Need Control Box I/O’s Programming Elec Controls 1/21 NO
1/17 Need to Finalize Weight Balance Mechanical Elec, Mechanical, Drive 1/31 NO
1/20 Mechanical Mounting Design for Mouse Electrical Drivetrain 1/28 NO
1/20 Update Bill of Materials Leadership ALL SUBTEAMS 1/31 NO
1/22 Camera Mount Design & location Programming Mechanical 1/31 NO
1/25 Investigate Clicking Noise Programming Drivetrain 1/27 NO

















Completed Issues

Date Issue Description Needed By (subteam) Assigned To (subteam) Date Needed Complete
1/13 Need to know what Sensors are needed Electrical, Programming Programming, Mechanical 1/18 YES
1/15 Determine if Encoder Wheel Needed Electrical/Mechanical Programming 1/17 YES
1/8 Available space and dimensions from Inventor mockup
Mechanical 1
Mechanical 2
1/18 YES
1/20 Fix Rubbing Wheel on Mock Drive Programming Drivetrain 1/21 NOT NEEDED 1/22
1/20 Add Fake Weight to the Chassis Programming Mechanical 1/21 YES 1/24
1/13 How are trapdoors defined? Programming Mechanical 1/18 YES - 1/25
1/22 Where do Sensors Go? Mechanical Electrical 1/24 YES - 1/25
1/20 Need to know how much frame detail is needed Mechanical Amy/Josh 1/22 YES - 1/25
1/15 Help Port ProE into Inventor Drivetrain Mechanical 1/18 YES - 1/27
1/25 Need Electrical Parts to Port in Mechanical Electrical 1/27 Completed
1/25 Test Mechanical Mouse Drivetrain Programming 1/27 YES - 1/27