2012:Drivetrain: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: = Resources = = Drivetrain Master Task List = = Drivetrain Subteam's Engineering Notebook = Engineering Notebook Templates Available at:[[Engineering Notebook Template|Engineering_N...)
 
No edit summary
 
(9 intermediate revisions by 2 users not shown)
Line 2: Line 2:


= Drivetrain Master Task List  =
= Drivetrain Master Task List  =
*Assemble Gearbox and Motor Assembly
*Determine Wheel Spacing
*Decide on Symmetric or Asymmetric Chassis Design
*Decide on Wheels or Skidplate for Barrier Crossing
*Finalize Drivetrain Design
*Fabricate E(pic)-brackets
*Assemble Chassis/Chains/Gearbox for Preliminary Tests
*Run Preliminary Chassis Tests on Field
*Attach Electrical Board To Chassis
*Weld Chassis
= Drivetrain Design Details =
* Classic 6-wheel, chain driven from central motor/gearbox
* Pneumatic tires
* Dual CIM motor drive
* Speed controllers on all motors
* <span style="color:red">Need transmission details</span>
* <span style="color:red">Need gearing details</span>
* Encoder on each side <span style="color:red">Need encoder part # or details as well as mount location</span>




= Drivetrain Subteam's Engineering Notebook  =
= Drivetrain Subteam's Engineering Notebook  =
== Week 1  ==
*[[2012:Drivetrain 01.14|1/14]]
== Week 2==
* [[2012:Drivetrain 01.15|1/15]]
* [[2012:Drivetrain 01.17|1/17]]
* [[2012:Drivetrain 01.18|1/18]]
* [[2012:Drivetrain 01.19|1/19]]
* [[2012:Drivetrain 01.21|1/21]]
== Week 3==
* [[2012:Drivetrain 01.22|1/22]]
* [[2012:Drivetrain 01.24|1/24]]
* [[2012:Drivetrain 01.25|1/25]]
* [[2012:Drivetrain 01.26|1/26]]
* [[2012:Drivetrain 01.28|1/28]]
== Week 4==
* [[2012:Drivetrain 01.29|1/29]]
* [[2012:Drivetrain 01.31|1/31]]
* [[2012:Drivetrain 02.01|2/01]]
* [[2012:Drivetrain 02.02|2/02]]
* [[2012:Drivetrain 02.04|2/04]]
== Week 5==
* [[2012:Drivetrain 02.05|2/05]]
* [[2012:Drivetrain 02.07|2/07]]
* [[2012:Drivetrain 02.08|2/08]]
* [[2012:Drivetrain 02.09|2/09]]
* [[2012:Drivetrain 02.10|2/10]]
* [[2012:Drivetrain 02.11|2/11]]
== Week 6==
* [[2012:Drivetrain 02.12|2/12]]
* [[2012:Drivetrain 02.13|2/13]]
* [[2012:Drivetrain 02.14|2/14]]
* [[2012:Drivetrain 02.15|2/15]]
* [[2012:Drivetrain 02.16|2/16]]
* [[2012:Drivetrain 02.17|2/17]]
* [[2012:Drivetrain 02.18|2/18]]
* [[2012:Drivetrain 02.19|2/19]]
* [[2012:Drivetrain 02.20|2/20]]
* [[2012:Drivetrain 02.21|2/21]]


Engineering Notebook Templates Available at:[[Engineering Notebook Template|Engineering_Notebook_Template]]  
Engineering Notebook Templates Available at:[[Engineering Notebook Template|Engineering_Notebook_Template]]  

Latest revision as of 20:28, 18 January 2012

Resources

Drivetrain Master Task List

  • Assemble Gearbox and Motor Assembly
  • Determine Wheel Spacing
  • Decide on Symmetric or Asymmetric Chassis Design
  • Decide on Wheels or Skidplate for Barrier Crossing
  • Finalize Drivetrain Design
  • Fabricate E(pic)-brackets
  • Assemble Chassis/Chains/Gearbox for Preliminary Tests
  • Run Preliminary Chassis Tests on Field
  • Attach Electrical Board To Chassis
  • Weld Chassis

Drivetrain Design Details

  • Classic 6-wheel, chain driven from central motor/gearbox
  • Pneumatic tires
  • Dual CIM motor drive
  • Speed controllers on all motors
  • Need transmission details
  • Need gearing details
  • Encoder on each side Need encoder part # or details as well as mount location


Drivetrain Subteam's Engineering Notebook

Week 1

Week 2

Week 3

Week 4

Week 5

Week 6

Engineering Notebook Templates Available at:Engineering_Notebook_Template

Please Label All Notebook Pages 2012:Drivetrain XX.XX to avoid confusion.

Archives