2012:Drivetrain: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 7: Line 7:
= Drivetrain Master Task List  =
= Drivetrain Master Task List  =


*Assemble Gearbox and Motor Assembly
*Determine Wheel Spacing
*Decide on Symmetric or Assymetric Chassis Design
*Decide on Wheels or Skidplate for Barrier
*Finalize Drivetrain Design
*Fabricate E-brackets
*Assemble Chassis/Chains/Gearbox for Preliminary Tests
*Attach Electrical Board To Chassis
*Weld Chassis


= Drivetrain Subteam's Engineering Notebook  =
= Drivetrain Subteam's Engineering Notebook  =

Revision as of 10:55, 15 January 2012

Resources

http://penfieldrobotics.com/wiki/images/6/6b/ForeDiagramWheelsAligned.jpg

http://penfieldrobotics.com/wiki/images/6/6f/WheelsBelowFrame.jpg

Drivetrain Master Task List

  • Assemble Gearbox and Motor Assembly
  • Determine Wheel Spacing
  • Decide on Symmetric or Assymetric Chassis Design
  • Decide on Wheels or Skidplate for Barrier
  • Finalize Drivetrain Design
  • Fabricate E-brackets
  • Assemble Chassis/Chains/Gearbox for Preliminary Tests
  • Attach Electrical Board To Chassis
  • Weld Chassis

Drivetrain Subteam's Engineering Notebook

Week 1

Week 2

Week 3

Week 4

Week 5

Week 6

Engineering Notebook Templates Available at:Engineering_Notebook_Template

Please Label All Notebook Pages 2012:Drivetrain XX.XX to avoid confusion.

Archives