*Assemble Gearbox and Motor Assembly | *Assemble Gearbox and Motor Assembly | ||
*Determine Wheel Spacing | *Determine Wheel Spacing | ||
*Decide on Symmetric or | *Decide on Symmetric or Asymetric Chassis Design | ||
*Decide on Wheels or Skidplate for Barrier | *Decide on Wheels or Skidplate for Barrier | ||
*Finalize Drivetrain Design | *Finalize Drivetrain Design | ||
*Fabricate E-brackets | *Fabricate E-brackets | ||
*Assemble Chassis/Chains/Gearbox for Preliminary Tests | *Assemble Chassis/Chains/Gearbox for Preliminary Tests | ||
*Run Preliminary Chassis Tests on Field | *Run Preliminary Chassis Tests on Field | ||
*Attach Electrical Board To Chassis | *Attach Electrical Board To Chassis | ||
*Weld Chassis | *Weld Chassis |
Revision as of 18:42, 15 January 2012
Resources
Drivetrain Master Task List
- Assemble Gearbox and Motor Assembly
- Determine Wheel Spacing
- Decide on Symmetric or Asymetric Chassis Design
- Decide on Wheels or Skidplate for Barrier
- Finalize Drivetrain Design
- Fabricate E-brackets
- Assemble Chassis/Chains/Gearbox for Preliminary Tests
- Run Preliminary Chassis Tests on Field
- Attach Electrical Board To Chassis
- Weld Chassis
Drivetrain Subteam's Engineering Notebook
Week 1
Week 2
Week 3
Week 4
Week 5
Week 6