2012:Drivetrain: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 16: Line 16:
= Drivetrain Subteam's Engineering Notebook  =
= Drivetrain Subteam's Engineering Notebook  =


== Week 1==
== Week 1 ==


* [[2012:Drivetrain 01.14|1/14]]
*[[2012:Drivetrain 01.14|1/14]]
 
[[Image:WheelsBelowFrame.jpg]]


== Week 2==
== Week 2==

Revision as of 16:58, 17 January 2012

Resources

Drivetrain Master Task List

  • Assemble Gearbox and Motor Assembly
  • Determine Wheel Spacing
  • Decide on Symmetric or Asymmetric Chassis Design
  • Decide on Wheels or Skidplate for Barrier Crossing
  • Finalize Drivetrain Design
  • Fabricate E(pic)-brackets
  • Assemble Chassis/Chains/Gearbox for Preliminary Tests
  • Run Preliminary Chassis Tests on Field
  • Attach Electrical Board To Chassis
  • Weld Chassis

Drivetrain Subteam's Engineering Notebook

Week 1

WheelsBelowFrame.jpg

Week 2

Week 3

Week 4

Week 5

Week 6

Engineering Notebook Templates Available at:Engineering_Notebook_Template

Please Label All Notebook Pages 2012:Drivetrain XX.XX to avoid confusion.

Archives