2012:Drivetrain: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Drivetrain (talk | contribs) No edit summary |
Drivetrain (talk | contribs) No edit summary |
||
Line 16: | Line 16: | ||
= Drivetrain Subteam's Engineering Notebook = | = Drivetrain Subteam's Engineering Notebook = | ||
== Week 1 == | == Week 1 == | ||
*[[2012:Drivetrain 01.14|1/14]] | *[[2012:Drivetrain 01.14|1/14]] | ||
== Week 2== | == Week 2== |
Revision as of 17:14, 17 January 2012
Resources
Drivetrain Master Task List
- Assemble Gearbox and Motor Assembly
- Determine Wheel Spacing
- Decide on Symmetric or Asymmetric Chassis Design
- Decide on Wheels or Skidplate for Barrier Crossing
- Finalize Drivetrain Design
- Fabricate E(pic)-brackets
- Assemble Chassis/Chains/Gearbox for Preliminary Tests
- Run Preliminary Chassis Tests on Field
- Attach Electrical Board To Chassis
- Weld Chassis
Drivetrain Subteam's Engineering Notebook
Week 1
Week 2
Week 3
Week 4
Week 5
Week 6
Engineering Notebook Templates Available at:Engineering_Notebook_Template
Please Label All Notebook Pages 2012:Drivetrain XX.XX to avoid confusion.