2012:Drivetrain 01.24: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
= Attendance =
= Attendance =


Line 7: Line 6:


'''Members present: '''
'''Members present: '''
'''Members Attending Next Meeting: '''
'''Members Attending Next Meeting: '''


Line 16: Line 14:
*Design improved
*Design improved
*inventor drawings updated.
*inventor drawings updated.
*discussed position for electrical board
*designed battery frame at the back of the drivetrail
[http://penfieldrobotics.com/wiki/index.php?title=File:Rear_pannel.png]
[http://penfieldrobotics.com/wiki/index.php?title=File:Rear_isometric_electircal.png]


= Tasks In Progress =  
= Tasks In Progress =  


*task
*2nd drive train fabrication
**sub-task
**sub-task
*task


= Tasks to Complete =
= Tasks to Complete =


*task
*the ones that arent done yet.
**sub-task
**sub-task
*task


= Materials Needed =
= Materials Needed =

Latest revision as of 18:57, 24 January 2012

Attendance

Start time:

End time:

Members present: Members Attending Next Meeting:

Tasks Completed

  • drivetrain completion.
  • electrical board installation
  • Design improved
  • inventor drawings updated.
  • discussed position for electrical board
  • designed battery frame at the back of the drivetrail

[1] [2]

Tasks In Progress

  • 2nd drive train fabrication

Tasks to Complete

  • the ones that arent done yet.

Materials Needed

  • task
    • sub-task
    • sub-task
  • task