2012:Drivetrain 01.24: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Programming (talk | contribs) (electrical actions) |
Mechanical1 (talk | contribs) |
||
Line 15: | Line 15: | ||
*inventor drawings updated. | *inventor drawings updated. | ||
*discussed position for electrical board | *discussed position for electrical board | ||
*designed battery frame at the back of the drivetrail | |||
[http://penfieldrobotics.com/wiki/index.php?title=File:Rear_pannel.png] | |||
[http://penfieldrobotics.com/wiki/index.php?title=File:Rear_isometric_electircal.png] | |||
= Tasks In Progress = | = Tasks In Progress = |
Latest revision as of 18:57, 24 January 2012
Attendance
Start time:
End time:
Members present: Members Attending Next Meeting:
Tasks Completed
- drivetrain completion.
- electrical board installation
- Design improved
- inventor drawings updated.
- discussed position for electrical board
- designed battery frame at the back of the drivetrail
Tasks In Progress
- 2nd drive train fabrication
Tasks to Complete
- the ones that arent done yet.
Materials Needed
- task
- sub-task
- sub-task
- task