2012:Drivetrain 01.24: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(electrical actions)
 
Line 15: Line 15:
*inventor drawings updated.
*inventor drawings updated.
*discussed position for electrical board
*discussed position for electrical board
*designed battery frame at the back of the drivetrail
[http://penfieldrobotics.com/wiki/index.php?title=File:Rear_pannel.png]
[http://penfieldrobotics.com/wiki/index.php?title=File:Rear_isometric_electircal.png]


= Tasks In Progress =  
= Tasks In Progress =  

Latest revision as of 18:57, 24 January 2012

Attendance

Start time:

End time:

Members present: Members Attending Next Meeting:

Tasks Completed

  • drivetrain completion.
  • electrical board installation
  • Design improved
  • inventor drawings updated.
  • discussed position for electrical board
  • designed battery frame at the back of the drivetrail

[1] [2]

Tasks In Progress

  • 2nd drive train fabrication

Tasks to Complete

  • the ones that arent done yet.

Materials Needed

  • task
    • sub-task
    • sub-task
  • task