2012:Drivetrain 01.24: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Drivetrain (talk | contribs) |
Drivetrain (talk | contribs) |
||
Line 19: | Line 19: | ||
= Tasks In Progress = | = Tasks In Progress = | ||
* | *2nd drive train fabrication | ||
= Tasks to Complete = | = Tasks to Complete = |
Revision as of 18:03, 24 January 2012
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks Completed
- drivetrain completion.
- electrical board installation
- Design improved
- inventor drawings updated.
Tasks In Progress
- 2nd drive train fabrication
Tasks to Complete
- task
- sub-task
- sub-task
- task
Materials Needed
- task
- sub-task
- sub-task
- task