2012:Drivetrain 01.24: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Drivetrain (talk | contribs) |
Drivetrain (talk | contribs) |
||
Line 23: | Line 23: | ||
= Tasks to Complete = | = Tasks to Complete = | ||
* | *the ones that arent done yet. | ||
= Materials Needed = | = Materials Needed = |
Revision as of 18:06, 24 January 2012
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks Completed
- drivetrain completion.
- electrical board installation
- Design improved
- inventor drawings updated.
Tasks In Progress
- 2nd drive train fabrication
Tasks to Complete
- the ones that arent done yet.
Materials Needed
- task
- sub-task
- sub-task
- task