2018:Controls

From 1511Wookiee
Revision as of 12:13, 13 January 2018 by ElectricalControls (talk | contribs)
Jump to navigationJump to search

Overall Concepts

NES

NES Dimensions:

  • Width: 10’’
  • Length: 8’’
  • Height: 3.5’’

Controls Dimensions:

  • Width: 16’’
  • Length: 14’’
  • *Height: 6.5’’

Details

  • Controller ports on front will be USB for the actual controllers
  • Where the white turns gray is where the system will fold open
  • When the laptop turns on or controls are plugged in, the light next to the power button will turn on
  • Video ports on side will be where the ethernet plug will be

SNES Controller

NES Cartridge

Details

  • Custom stickers on cartridge
  • Folds out from the left side of the “notch” of the cartridge

Top Half of Arcade Cabinet    

GameBoy

To do

Not Started

In Process

Completed

Useful Links

Meeting Minutes

1/10

Attendees: Zach, Kyle, Jameson, Parker, Eric, Byers

Work Completed: Brainstormed ideas for control sets. 

1/11

Attendees: 

Work Completed: 

1/13

Attendees: 

Work Completed: 

1/14

Attendees: 

Work Completed: 

1/16

Attendees: 

Work Completed: 

1/17

Attendees: 

Work Completed: 

1/18

Attendees: 

Work Completed: 

1/20

Attendees: 

Work Completed: 

1/21

Attendees: 

Work Completed: 

1/23

Attendees: 

Work Completed: 

1/24

Attendees: 

Work Completed: 

1/25

Attendees: 

Work Completed: 

1/27

Attendees: 

Work Completed: 

1/28

Attendees: 

Work Completed: 

1/30

Attendees: 

Work Completed: 

1/31

Attendees: 

Work Completed: 

2/1

Attendees: 

Work Completed: 

2/3

Attendees: 

Work Completed: 

2/4

Attendees: 

Work Completed: 

2/6

Attendees: 

Work Completed: 

2/7

Attendees: 

Work Completed: 

2/8

Attendees: 

Work Completed: 

2/9

Attendees: 

Work Completed: 

2/10

Attendees: 

Work Completed: 

2/11

Attendees: 

Work Completed: 

2/12

Attendees: 

Work Completed: 

2/13

Attendees: 
Work Completed: 

2/14

Attendees: 

Work Completed: 

2/15

Attendees: 

Work Completed: 

2/16

Attendees: 

Work Completed: 

2/17

Attendees: 

Work Completed: 

2/18

Attendees: 

Work Completed: 

2/19

Attendees: 

Work Completed: 

2/20

Attendees: 

Work Completed: 

Archives